• << January 2022 >>
    S M T W T F S
    1
    2 3 4 5 6 7 8
    9 10 11 12 13 14 15
    16 17 18 19 20 21 22
    23 24 25 26 27 28 29
    30 31
    Follow Us!
    Facebook icon Twitter icon
    Newsletter Sign-up
    Sign-up for newsletter & email updates
  • 1 Results

      Status Book Contractor Start Date/Time # Positions Location Duration
    1. 1. Open Book : Inside Wireman Contractor: McGrath Electric Start Date/Time: 01/28/2022 7am # Positions: 1 Location: Travis AFB Hanger 3 Duration: Long
     
    Travis AFB Hanger 3 - Dispatch Thursday 1-28-2022, report to work 1-28-2022 immediately after dispatch
      Hours Per Week: 40
      Comments: Prefer OSHA 10, scissor lift and aerial lift training, and fall protection training. Will need to bring 2 forms of ID, and current auto insurance and registration. There will be a Background Check and Drug Testing
     

  • International Brotherhood of Electrical Workers

    Copyright © 2022.
    All Rights Reserved.

    Powered By UnionActive

    61669 hits since Feb 11, 2021


  • Top of Page image